/g The Contract Codex ← 返回动态 Catalog

DAG-Aware Semantic Merge Repair

Make orchestration merge failures repairable by using plan DAG context, conflict bundles, planner-mediated repair, and bounded retry.

难度:intermediate 分类:orchestration 来源:deadreckon goal corpus

完整 Prompt(可直接复制)

/goal
GOAL:
Complete DAG-Aware Semantic Merge Repair for an agent orchestration task: Make orchestration merge failures repairable by using plan DAG context, conflict bundles, planner-mediated repair, and bounded retry.

CONTEXT:
- Before editing, read the nearest AGENTS.md/CLAUDE.md, current issue or PLAN.md, and any failing logs already in the repo.
- Inspect plans, worktrees, subtask ownership, PRs, and coordination notes.
- Establish a baseline by running or locating evidence for: `DAG smoke, repair smoke, refusal smoke, cargo build/test/clippy/fmt`.

CONSTRAINTS:
- Keep the scope limited to this goal; do not expand into unrelated cleanup.
- Do not weaken tests, delete assertions, or mask errors to make verification pass.
- Respect the repository's AGENTS.md/CLAUDE.md instructions and existing patterns.
- Keep subtask ownership explicit and avoid overlapping write scopes.
- Do not merge or deploy automatically unless the goal explicitly allows it.

DONE WHEN:
- The implementation or documentation directly satisfies: Make orchestration merge failures repairable by using plan DAG context, conflict bundles, planner-mediated repair, and bounded retry.
- The verification command or evidence path succeeds: `DAG smoke, repair smoke, refusal smoke, cargo build/test/clippy/fmt`.
- The final diff is scoped to the relevant files and has no unrelated formatting churn.

VERIFY:
- Run `DAG smoke, repair smoke, refusal smoke, cargo build/test/clippy/fmt` or the closest repo-local equivalent if the exact command is not available.
- Capture before/after evidence for the behavior, metric, report, or artifact involved.
- If verification cannot run locally, stop and report the missing dependency instead of guessing success.

OUTPUT:
- Summarize changed files, key decisions, verification output, and remaining risks.
- Include any follow-up that is required for production rollout or human review.

STOP RULES:
- Pause if secrets, production access, stakeholder decisions, or destructive data operations are required.
- Pause after three failed fix attempts on the same symptom and challenge the root-cause hypothesis.
- Do not mark the goal complete until the current repository state has been audited against DONE WHEN.

来源与证据

原始来源: deadreckon goal corpus

证据摘要: Land DAG-aware merge plus automatic planner-mediated repair for true conflicts; source: deadreckon goal corpus; type: third-party-project; verification: DAG smoke, repair smoke, refusal smoke, cargo build/test/clippy/fmt