/g The Contract Codex ← 返回动态 Catalog

SPARC Payment Processing Plan

Plan and implement payment processing through SPARC phases with requirements, pseudocode, architecture, TDD refinement, and integration.

难度:intermediate 分类:backend-api 来源:claude-flow code-goal-planner skill

完整 Prompt(可直接复制)

/goal
GOAL:
Complete SPARC Payment Processing Plan for a backend API service: Plan and implement payment processing through SPARC phases with requirements, pseudocode, architecture, TDD refinement, and integration.

CONTEXT:
- Before editing, read the nearest AGENTS.md/CLAUDE.md, current issue or PLAN.md, and any failing logs already in the repo.
- Inspect API routes, OpenAPI specs, handlers, middleware, and API tests.
- Establish a baseline by running or locating evidence for: `acceptance criteria, API contracts, unit and integration tests, coverage target, integration validation`.

CONSTRAINTS:
- Keep the scope limited to this goal; do not expand into unrelated cleanup.
- Do not weaken tests, delete assertions, or mask errors to make verification pass.
- Respect the repository's AGENTS.md/CLAUDE.md instructions and existing patterns.

DONE WHEN:
- The implementation or documentation directly satisfies: Plan and implement payment processing through SPARC phases with requirements, pseudocode, architecture, TDD refinement, and integration.
- The verification command or evidence path succeeds: `acceptance criteria, API contracts, unit and integration tests, coverage target, integration validation`.
- The final diff is scoped to the relevant files and has no unrelated formatting churn.

VERIFY:
- Run `acceptance criteria, API contracts, unit and integration tests, coverage target, integration validation` or the closest repo-local equivalent if the exact command is not available.
- Capture before/after evidence for the behavior, metric, report, or artifact involved.
- If verification cannot run locally, stop and report the missing dependency instead of guessing success.

OUTPUT:
- Summarize changed files, key decisions, verification output, and remaining risks.
- Include any follow-up that is required for production rollout or human review.

STOP RULES:
- Pause if secrets, production access, stakeholder decisions, or destructive data operations are required.
- Pause after three failed fix attempts on the same symptom and challenge the root-cause hypothesis.
- Do not mark the goal complete until the current repository state has been audited against DONE WHEN.

来源与证据

原始来源: claude-flow code-goal-planner skill

证据摘要: goal: implement_payment_processing_with_sparc; source: claude-flow code-goal-planner skill; type: tool-readme; verification: acceptance criteria, API contracts, unit and integration tests, coverage target, integration validation